UK Network Planning
Coverage, capacity and delivery costs across 2,943 Postcode Districts.
Planning assumptions
Set national volume, settlement and delivery costs.
Cost assumptions · review before quoting
Coverage Centers
National demand stays fixed. Removing a Center reduces covered volume; it does not move that volume elsewhere.
Click a District for details. Enable map selection to build a bundle.
100,000 display points · loading after map initialisation.
Data sources and allocation
40 existing Outlets + 85 unassigned planning territories. Unassigned territories are recruitment opportunities; they are not active CSP coverage. Their costs use existing Center pools until a standalone bundle is quoted.
Monthly demand uses the canonical District population shares. Within each mapped District, points are sampled from populated residential cells in WorldPop 2025 · ~100m · R2025A v1 (alpha). A fixed seed keeps comparisons stable. Heat uses zoom-adaptive density; at street zoom it transitions to points.
Northern Ireland uses an ONS country boundary: BT demand is distributed at territory level; individual BT District boundaries remain unavailable. Non-geographic or unsupported locations are excluded from dots, with all Districts retained in calculations.
Allocation basis: District population shares and residential population cells. The 15 million monthly base is editable.
WorldPop © University of Southampton · CC BY 4.0. Contains Ordnance Survey data © Crown copyright and database right 2024; ONS data © Crown copyright and database right 2024.
Delivery results
Loading calculations…
Coverage totals
Capacity is rounded within each Outlet operating pool.
Covered volume / month
Volume / day
Drivers / vehicles
Cost / month
Profit / parcel
Profit / month
Break-even / parcel
Selected bundle
Search for a postcode and add its District, or enable map selection.